By Capt. (Dr.) RC Muni (Retd) · Defence faculty, The Cavalier
A ship joins the Navy on the day it is commissioned: the commissioning pennant is broken, the National Flag is hoisted for the first time, and the crew takes charge. Between 1 January and 27 November 2026 PIB confirms ten Indian Navy ships commissioned: three stealth frigates, four anti-submarine shallow-water craft, a survey vessel, a diving support vessel and a multi-purpose vessel. Papers ask which ship, class, yard and date, so this page keeps one dated table to learn from.
It sits under Indian Navy Surface Ships, which explains the classes. Here the unit is the event. Only ships whose commissioning a PIB release confirms are in the main table; deliveries and launches are kept apart and labelled.
Every Ship Commissioned in 2026, in Date Order
The # column is the ship's place among the Navy's 2026 commissionings. The "presided by" column gives the office, as PIB records it. Count and list are as of 27 November 2026.
| # | Ship | Class / project | Type | Date | Place | Builder | Presided by | PIB ID |
|---|---|---|---|---|---|---|---|---|
| 1 | INS Anjadip | Arnala class (frigates and corvettes) | Anti-submarine warfare shallow water craft | 27 Feb 2026 | Chennai Port | GRSE, Kolkata | Chief of the Naval Staff | 2233666 |
| 2 | INS Taragiri (F41) | Project 17A, Nilgiri class (stealth frigates) | Stealth frigate | 3 Apr 2026 | Visakhapatnam | Mazagon Dock (MDL), Mumbai | Raksha Mantri (Defence Minister) | 2248799 |
| 3 | INS Dunagiri | Project 17A, Nilgiri class | Stealth frigate | 21 Jun 2026 | Kolkata (Syama Prasad Mookerjee Port) | GRSE, Kolkata | Prime Minister | 2276104 |
| 4 | INS Sanshodhak | Survey Vessel (Large), Sandhayak class | Survey vessel | 21 Jun 2026 | Kolkata | GRSE, Kolkata | Prime Minister | 2276104 |
| 5 | INS Agray | Arnala class | Anti-submarine warfare shallow water craft | 21 Jun 2026 | Kolkata | GRSE, Kolkata | Prime Minister | 2276104 |
| 6 | INS Mahendragiri (F38) | Project 17A, Nilgiri class | Stealth frigate | 11 Jul 2026 | Visakhapatnam | MDL, Mumbai | Raksha Mantri (Defence Minister) | 2283586 |
| 7 | INS Malvan | Mahe class (CSL) | Anti-submarine warfare shallow water craft | 22 Jul 2026 | Karwar | Cochin Shipyard (CSL), Kochi | Chief of the Air Staff | 2287788 |
| 8 | INS Nipun | Nistar class | Diving support vessel | 31 Aug 2026 | Naval Dockyard, Mumbai | Hindustan Shipyard (HSL), Visakhapatnam | Chief of the Naval Staff | 2305003 |
| 9 | INS Mangrol (P82) | Mahe class (CSL) | Anti-submarine warfare shallow water craft | 12 Oct 2026 | Naval Dockyard, Mumbai | CSL, Kochi | Flag Officer Commanding-in-Chief, Western Naval Command | 2322494 |
| 10 | INS Samarthak | Multi-Purpose Vessel, first of class | Multi-purpose vessel | 16 Oct 2026 | Naval Base, Karwar | Larsen & Toubro (L&T) | Vice-President of India | 2324581; 2322795 |
Class pages: the carrier is on Aircraft Carriers (none was commissioned this year), the destroyers on Guided Missile Destroyers, the diving and multi-purpose ships on Amphibious and Support Ships, and the submarines on Diesel-Electric Submarines and Nuclear Submarines. The PIB releases we reviewed show no submarine commissioned in 2026.
- 16 Oct 2026: INS Samarthak, the first Multi-Purpose Vessel, commissioned at Karwar by the Vice-President of India.
- 12 Oct 2026: INS Mangrol, third Mahe-class craft, commissioned at Naval Dockyard, Mumbai.
- 31 Aug 2026: INS Nipun, second Diving Support Vessel, commissioned at Naval Dockyard, Mumbai.
Since then PIB has announced two deliveries, Amini (5 Nov 2026) and Ashank (23 Nov 2026), both Arnala-class craft, and a diving support craft, DSC A21 (20 Nov). We found no commissioning release for any of them up to 26 Nov 2026.
PIB's preview of 23 Feb called Anjadip the "third vessel" of the eight-ship project, meaning GRSE's eight. Its commissioning release of 27 Feb called her the "fourth ship" of the ASW-SWC project, counting all sixteen. Both are right: third of GRSE's, fourth overall, after Arnala, Androth and Mahe. PIB calls Malvan the sixth of 16 commissioned, so Mangrol is the seventh. UPSC follows official figures; quote the overall count.
Ships with the prefix ICGS belong to the Indian Coast Guard, which sits under the Ministry of Defence but is a separate force. PIB records ICGS Samudra Pratap (5 Jan), ICGS Achal (9 May) and ICGS Akshay (27 Jun) as commissioned into the Coast Guard in 2026. Navy ships carry INS, "Indian Naval Ship".
Launch, Delivery, Commissioning: The Life of a New Warship
Questions mix these three words. They are different days, often months apart.

| Stage | What happens | Who acts |
|---|---|---|
| Steel cutting, keel laying | Construction begins; the keel is the first block set on the slipway | The shipyard |
| Launch | The hull is floated out; outfitting continues afloat. A launch is not an induction | The yard; a ceremony, often by a naval officer's wife |
| Trials | Harbour and sea trials of machinery, sensors and weapons | Yard and Navy together |
| Delivery | The builder hands the finished ship to the Navy, a contract milestone | Builder to the Navy |
| Commissioning | The ship enters service: commissioning pennant broken, National Flag hoisted for the first time | A presiding dignitary; the crew takes over |
PIB describes the commissioning of INS Taragiri and of the Kolkata trio as "the ceremonial breaking of the Commissioning Pennant and the maiden hoisting of the National Flag". For INS Nipun it says that with the hoisting of the pennant the ship "formally entered operational service". PIB's own dates show the gap between delivery and commissioning in 2026.
| Ship | Delivered to Navy | Commissioned | Gap |
|---|---|---|---|
| INS Dunagiri, Sanshodhak, Agray (GRSE) | 30 Mar 2026 | 21 Jun 2026 | 83 days |
| INS Malvan (CSL) | 31 Mar 2026 | 22 Jul 2026 | 113 days |
| INS Mahendragiri (MDL) | 30 Apr 2026 | 11 Jul 2026 | 72 days |
| INS Nipun (HSL) | 30 Jul 2026 | 31 Aug 2026 | 32 days |
| INS Mangrol (CSL) | 21 Aug 2026 | 12 Oct 2026 | 52 days |
| INS Samarthak (L&T) | 27 Aug 2026 | 16 Oct 2026 | 50 days |
| INS Amini (GRSE) | 5 Nov 2026 | no PIB release by 26 Nov | open |
| INS Ashank (GRSE) | 23 Nov 2026 | no PIB release by 26 Nov | open |
Other 2026 milestones, none a commissioning: the first Cadet Training Ship, Krishna, was launched at L&T Kattupalli on 16 Feb; Machilipatnam, seventh of CSL's eight ASW craft, on 29 Jul; and the first indigenous Fleet Support Ship, Surya, at HSL, Visakhapatnam on 6 Oct (PIB). Fleet support ships are covered on Amphibious and Support Ships.
A ship can be commissioned again. PIB records INS Tarmugli: commissioned as INS Tillanchang, gifted to the Maldives in 2006, returned in 2023, then recommissioned at Visakhapatnam on 14 Dec 2023 under her new name. A past paper asked exactly this (see below).
What the 2026 List Shows
Yards. Ten ships came from five yards: GRSE (four: Anjadip, Dunagiri, Sanshodhak, Agray), MDL (two frigates), CSL (two Mahe-class craft), HSL (Nipun) and L&T (Samarthak). Four of the five are public-sector yards; INS Samarthak is, in PIB's words, "the first major warship to be built by an Indian private shipyard". The yards themselves are on defence PSUs.
Classes completing. With Sanshodhak the four-ship Survey Vessel (Large) project is complete: Sandhayak (3 Feb 2024), Nirdeshak (18 Dec 2024), Ikshak (6 Nov 2025) and Sanshodhak (PIB, 31 Mar 2026). Project 17A stands at six commissioned (Nilgiri in Jan 2025, Udaygiri and Himgiri in Aug 2025, then Taragiri, Dunagiri and Mahendragiri in 2026). The Mahe class stands at three of eight, and Arnala-class craft are still being delivered.
Indigenous content. PIB gives it ship by ship: over 80% for Anjadip, Malvan and Mangrol, over 75% for Taragiri, the Kolkata trio, Mahendragiri and Samarthak. PIB's release on Nipun gives no figure, so none is quoted here. The Defence Minister said on 29 Sep that the recently commissioned warships contain over 75% indigenous content (PIB). The wider case is on defence indigenisation and exports.
Pace. At Kolkata on 21 June the Prime Minister said more than 40 indigenously built warships and submarines had been inducted in recent years and 45 major platforms were under construction (PIB). The Kolkata tri-commissioning came 17 months after the first, at Mumbai on 15 January 2025, when INS Nilgiri, Surat and Vaghsheer were commissioned together.
Old Names, New Ships
The Navy gives retired names to new ships, and PIB's releases usually say whose name it is.
| New ship (2026) | Carries the name of (PIB) |
|---|---|
| INS Dunagiri | A Leander-class frigate in service 5 May 1977 to 10 Oct 2010 |
| INS Taragiri | A Leander-class frigate commissioned in 1980 |
| INS Agray | The fourth of the 1241 PE class of patrol vessels, decommissioned in 2017 |
| INS Malvan | An inshore minesweeper, in service until 2003; the town is in Maharashtra |
| INS Mangrol | The minesweeper Mangrol (M85), in service until April 2004; the town is in Junagadh district, Gujarat |
Naming patterns (hills for Nilgiri-class frigates, coastal towns for Mahe-class craft, names starting with A for the Arnala class) are set out on Surface Ships.
How Examiners Ask About New Commissionings
The pattern in recent papers: a group question (which ships were commissioned together), a class question (what is Arnala, what is P-17A), or a recommissioning twist. Three habits help.
- Learn the date with the place. Kolkata for the trio, Chennai for Anjadip, Karwar for Malvan and Samarthak, Mumbai for Nipun and Mangrol, Visakhapatnam for the two frigates.
- Tie each ship to one yard. GRSE builds the Kolkata ships, MDL the Project 17A frigates of the year, CSL the Mahe class, HSL the diving vessel, L&T the multi-purpose vessel.
- Do not give a delivery date as a commissioning date. Dunagiri was delivered on 30 March and commissioned on 21 June.
Our daily notes covered the Kolkata tri-commissioning, INS Nipun and INS Samarthak; more in NDA defence current affairs.
How This Log Is Updated
New rows are added here after each commissioning, with the PIB release ID, and the "Changed recently" box moves forward. At the start of each year a fresh page starts; this one stays up as the 2026 archive.
Exam pins
- Ten Navy ships commissioned in 2026 up to 27 Nov, on eight dates.
- First: INS Anjadip, 27 Feb 2026, Chennai (ASW shallow water craft, GRSE).
- Taragiri (3 Apr, Visakhapatnam), Dunagiri (21 Jun) and Mahendragiri (11 Jul, Visakhapatnam) are Project 17A frigates; Mahendragiri is the sixth.
- 21 Jun 2026, Kolkata: Dunagiri, Sanshodhak and Agray commissioned together, all built by GRSE.
- Sanshodhak completes the four-ship Survey Vessel (Large) project.
- Malvan (22 Jul, Karwar) and Mangrol (12 Oct, Mumbai) are Mahe-class craft built by CSL.
- INS Nipun (31 Aug, Mumbai): second Diving Support Vessel, built by HSL, can support submarine rescue.
- INS Samarthak (16 Oct): first Multi-Purpose Vessel, first major warship from a private yard (L&T).
- Delivery, launch and commissioning are different dates; commissioning is the one that counts as joining the Navy.
- ICGS ships are Coast Guard, INS ships are Navy.
Asked in past papers
Recent CDS papers have asked about Navy ships in service and just commissioned.
Which one of the following statements about 'Nilgiri', 'Surat' and 'Vaghsheer' is correct?
(a) These are Tiger Reserves in the state of Gujarat. (b) These are combatants commissioned by the Indian Navy. (c) These are Biodiversity parks maintained by the Indian Army. (d) These are Tiger Reserves maintained by the Indian Navy.
Answer: (b). PIB records the three, a stealth frigate, a destroyer and a submarine, commissioned together at Mumbai on 15 January 2025. The tempting option is (a): Surat is also a Gujarat city, but it gives its name here to a P-15B destroyer.
Which of the following statements are correct about 'Arnala', an Anti-Submarine Warfare Shallow Water Craft? 1. It is indigenously designed in India. 2. It is named after the historic Arnala fort located in Maharashtra. 3. It has been built under a Public-Private Partnership (PPP) of GRSE with M/s L&T Shipyard.
(a) 1 and 2 only (b) 2 and 3 only (c) 1 and 3 only (d) 1, 2 and 3
Answer: (d). PIB's release of 18 June 2025 calls Arnala the first of the class, "named after the historic coastal fort off Maharashtra", with representatives of GRSE and L&T Shipbuilding at the ceremony. Anjadip and Agray in the table above are later Arnala-class craft.
Which one of the following statements about 'INS Tarmugli' is not correct?
(a) It is a fast attack craft commissioned by the Indian Navy. (b) It was commissioned at Naval Dockyard, Visakhapatnam. (c) It was given by the Government of India to Sri Lankan Naval Force in 2006 and returned to the Indian Navy in May 2023. (d) It is supposed to be used for coastal surveillance.
Answer: (c). PIB says the ship was gifted to the Maldives National Defence Force in 2006, not Sri Lanka, returned in 2023 and recommissioned at Naval Dockyard, Visakhapatnam on 14 Dec 2023, so (b) is true. The stored key for this question was (b); it is wrong, and the answer here is checked against PIB.
Practice MCQs (with answers)
- According to PIB, the first Indian Navy ship commissioned in 2026 was
- INS Anjadip
- INS Taragiri
- INS Dunagiri
- INS Mahendragiri
- Which three Navy ships were commissioned together at Kolkata on 21 June 2026?
- Taragiri, Anjadip and Malvan
- Dunagiri, Sanshodhak and Agray
- Mangrol, Nipun and Samarthak
- Mahendragiri, Dunagiri and Malvan
- INS Samarthak is notable as
- the first nuclear submarine of the year
- India's second indigenous aircraft carrier
- the first major warship built by an Indian private shipyard
- the Navy's first hospital ship
- INS Nipun, commissioned on 31 August 2026, was built by
- Cochin Shipyard Limited
- Garden Reach Shipbuilders & Engineers
- Mazagon Dock Shipbuilders
- Hindustan Shipyard Limited
- For a new warship, the usual order of events is
- commissioning, delivery, launch
- launch, commissioning, delivery
- launch, delivery, commissioning
- delivery, launch, commissioning
- Which pair are both Mahe-class craft commissioned in 2026?
- Anjadip and Agray
- Malvan and Mangrol
- Taragiri and Mahendragiri
- Nipun and Samarthak
1-a, 2-b, 3-c, 4-d, 5-c, 6-b. Q1: Taragiri followed on 3 April; the Coast Guard's Samudra Pratap (5 Jan) is not a Navy ship. Q2: the other options mix ships from different days. Q4: Nipun came from HSL; GRSE built the Kolkata trio, MDL the frigates and CSL the Mahe-class craft. Q5: a ship is launched, then delivered after trials, then commissioned; Dunagiri was delivered on 30 March and commissioned on 21 June. Q6: Anjadip and Agray are Arnala-class craft, Taragiri and Mahendragiri are frigates, and Nipun and Samarthak are support vessels.
Where to Go Next
For the classes behind these ships, go to Indian Navy Surface Ships and Submarines, or back to the Indian Navy hub. For the career side read career in the Indian Navy. Boards ask about the service you want to join, and a new ship is a good talking point: see SSB current affairs. Graduates reach the Navy through the CDS course and 12th-pass candidates through the NDA batches.
Frequently asked questions
How many ships has the Indian Navy commissioned in 2026?
Ten Indian Navy ships were commissioned from 1 January to 27 November 2026, according to PIB releases: INS Anjadip, Taragiri, Dunagiri, Sanshodhak, Agray, Mahendragiri, Malvan, Nipun, Mangrol and Samarthak. They came on eight dates, as Dunagiri, Sanshodhak and Agray were commissioned together.
Which ships were commissioned together at Kolkata on 21 June 2026?
INS Dunagiri, a Project 17A stealth frigate, INS Sanshodhak, a Survey Vessel (Large), and INS Agray, an anti-submarine warfare shallow water craft. All three were built by GRSE, and PIB says the Prime Minister commissioned them at Syama Prasad Mookerjee Port.
What is the difference between launching, delivering and commissioning a warship?
Launching floats the hull out of the slipway, delivery is the builder handing the finished ship to the Navy after trials, and commissioning is the ceremony in which the ship formally enters service. For INS Dunagiri PIB records delivery on 30 March 2026 and commissioning on 21 June 2026.
Which was the first Indian Navy warship commissioned in 2026?
INS Anjadip, an anti-submarine warfare shallow water craft built by GRSE, was commissioned at Chennai Port on 27 February 2026. The Chief of the Naval Staff presided. Coast Guard vessels such as ICGS Samudra Pratap, commissioned on 5 January, are not Navy ships.
Has the Indian Navy commissioned a submarine in 2026?
The PIB releases we reviewed show no submarine commissioned between 1 January and 27 November 2026. The submarine most often asked about is INS Vaghsheer, commissioned on 15 January 2025 together with INS Nilgiri and INS Surat at Mumbai.
More in Indian Navy
← Back to Indian Navy · Defence GK home
Sources: pib.gov.in/PressReleasePage.aspx?PRID=2276104 · pib.gov.in/PressReleasePage.aspx?PRID=2283586 · pib.gov.in/PressReleasePage.aspx?PRID=2324581 · pib.gov.in/PressReleasePage.aspx?PRID=2233666