By Capt. (Dr.) RC Muni (Retd) · Defence faculty, The Cavalier
An aircraft carrier is a runway that moves: it puts fighters over the sea far from any airfield, which is why PIB calls the carrier battle group a key capability for air dominance and sea control. India has operated four carriers: the old INS Vikrant (1961), INS Viraat (1987), INS Vikramaditya (2013) and the new INS Vikrant (2022), the first carrier India designed and built itself. The papers ask which ship is which, and which is indigenous.
This page sits under Indian Navy Surface Ships in our Defence GK library. It has every carrier in one table, explains STOBAR, CATOBAR and STOVL simply, and states what has been officially said about a second indigenous carrier.
Every Indian Carrier at a Glance
Two ships came second-hand from Britain, one from Russia, and one was built at home.
| Ship | Where it came from | Commissioned | Left service | Facts to hold |
|---|---|---|---|---|
| INS Vikrant (R11), the first carrier | Built in Britain as HMS Hercules; launched 22 Sep 1945, construction stalled, bought by India in 1957 | 4 Mar 1961 | Decommissioned 31 Jan 1997 (36 years) | About 19,500 tonnes; Sea Hawk and Alizé aircraft, later the Sea Harrier (PIB dates this form to 1984); first carrier of any Asian country (PIB) |
| INS Viraat | Built for the Royal Navy as HMS Hermes (1959); bought on 24 Apr 1986 | 12 May 1987 | Decommissioned 6 Mar 2017 | 227 m, 28,700 tonnes full load; 30 years in Indian service and 27 in the Royal Navy (PIB) |
| INS Vikramaditya | Russian Admiral Gorshkov, refurbished in Russia for India | 16 Nov 2013, at Severodvinsk, Russia | In service | Over 285 m long: the biggest ship in the Navy (PIB); MiG-29K fighters |
| INS Vikrant (IAC-1), the indigenous carrier | Designed by the Navy's Warship Design Bureau, built by Cochin Shipyard Limited (CSL), Kochi | 2 Sep 2022, by the Prime Minister | In service | 262.5 m, about 45,000 tonnes; 76% indigenous; up to 30 aircraft; largest warship built in India (PIB) |
PIB's curtain-raiser (25 Aug 2022) and commissioning release (2 Sep 2022) gave about 43,000 tonnes full load; its delivery release (28 Jul 2022), its 6 Sep 2022 feature and the backgrounder of 24 Oct 2025 say about 45,000 tonnes. Use about 45,000 tonnes; UPSC follows official figures. Vikramaditya is the longer ship, but Vikrant is the largest built in India.
The old Vikrant was bought in 1957, commissioned in 1961 and decommissioned in 1997; the new one was delivered on 28 Jul 2022 and commissioned on 2 Sep 2022. Viraat is a second-hand British ship, not Indian-built.
STOBAR, CATOBAR and STOVL: How a Carrier Launches and Lands
A carrier deck is short, so the question is how a fast jet gets airborne and how it stops. Each abbreviation below says how the aircraft takes off and then how it lands.

| Method | Take-off | Landing | India |
|---|---|---|---|
| STOBAR Short Take-Off But Arrested Recovery | Jet runs under its own power and is launched upward by a ski-jump ramp at the bow | Tail hook catches one of the arrester wires stretched across the deck | INS Vikrant (three arrester wires, PIB) and INS Vikramaditya (converted to STOBAR, the Navy says), flying the MiG-29K |
| CATOBAR Catapult Assisted Take-Off But Arrested Recovery | A catapult flings the jet off the deck | Arrester wires, as above | None in service today; PIB says the Navy has operated "all variants" of launch and recovery since the sixties |
| STOVL Short Take-Off and Vertical Landing | Short run, often off a ramp | The jet hovers and settles straight down, so no wires are needed | The refitted old Vikrant and INS Viraat, with the Sea Harrier (retired 11 May 2016) |
PIB describes the new Vikrant as "Short Take Off But Arrested Recovery (STOBAR)", with a ski-jump to launch and three arrester wires to recover aircraft. Hermes was fitted with a 12-degree ramp for the Sea Harrier before India bought her: that is the STOVL era. A ski-jump has almost no machinery, while a catapult needs heavy equipment on board but can generally launch heavier loads. Memory line: STOBAR needs a ramp, CATOBAR needs a catapult, STOVL needs neither.
Fixed-wing flying from the new Vikrant began after commissioning: a MiG-29K and an LCA (Navy) first landed on 6 Feb 2023 and night landings followed in May 2023 (PIB). Aircraft details are on Naval Aviation and Fighter Squadrons; the Air Force's fighters are on IAF fighter jets.
The Air Wing: What Flies from the Deck
PIB says the new Vikrant can operate an air wing of 30 aircraft. Its 24 Oct 2025 backgrounder lists these types.
| Aircraft | Role on the carrier |
|---|---|
| MiG-29K (and the MiG-29KUB two-seater) | The carrier fighter: air defence and strike; flown from both carriers |
| Kamov-31 | Airborne early-warning helicopter: a radar in the sky to spot low-flying threats |
| MH-60R | Multi-role helicopter, strong at hunting submarines |
| ALH and Chetak | Utility and rescue; a Sea King from Vikrant winched three injured seafarers off MV Heilan Star in March 2025 (PIB) |
| LCA (Navy) | Indigenous naval Tejas; landed on Vikrant in Feb 2023 but remains a trials aircraft |
The Rafale M. On 28 April 2025 India and France signed an intergovernmental agreement for 26 Rafale-Marine fighters: 22 single-seat and four twin-seat, worth about Rs 63,000 crore according to PIB, with training, simulators and weapons. PIB says the jets will serve on both carriers and calls them an interim step until India's own Twin Engine Deck Based Fighter is ready; the Year End Review of 31 Dec 2025 says delivery would be completed by 2030.
PIB gives "approximately Rs 63,000 crore"; some press reports round it to Rs 64,000 crore. Quote the PIB figure. The count to remember is 26 = 22 + 4. For delivery, ANI (30 Oct 2026) quotes officials for late 2028 or early 2029; PIB says 2030, so use PIB's.
INS Vikrant (IAC-1): India's Own Carrier
Project IAC-1 is the first carrier designed by the Navy's own bureau and built in India. PIB's steps: steel cutting Apr 2005; keel laid Feb 2009; launched Aug 2013; maiden sea trials 4 Aug 2021; delivered by CSL 28 Jul 2022, at a cost close to Rs 20,000 crore; commissioned at Kochi by the Prime Minister on 2 Sep 2022, the day the new Naval Ensign was unveiled.
What she is. Four gas turbines give about 88 MW and a maximum designed speed of 28 knots; endurance is 7,500 nautical miles (PIB, 2022). She carries about 1,600 crew, women included. The name means "victorious and gallant" (PIB).
What is indigenous. The 76% figure includes about 30,000 tonnes of steel from SAIL, made with DRDO and the Navy so that India no longer needs to import warship steel(PIB, Oct 2025). Our note on SAIL's naval steel DMR-249A explains the alloy. PIB lists the USA, UK, France, Russia and China as the other carrier builders. Builders and policy are on defence PSUs and defence indigenisation and exports.
What she has done. PIB's backgrounder records Exercise Varuna with the French carrier group in March 2025, the Prime Minister's overnight sea sortie on 19 to 20 October 2025, and that the Vikrant carrier battle group was deployed in the northern Arabian Sea during Operation Sindoor. The war's outline is on Operation Sindoor.
- Late Nov to Dec 2025: INS Vikrant and INS Udaygiri reached Colombo with relief supplies after Cyclone Ditwah, under Operation Sagar Bandhu (PIB Year End Review, 31 Dec 2025).
- 25 Feb 2026: the closing ceremony of Exercise MILAN 2026 was held on INS Vikrant off Visakhapatnam (PIB).
- 29 Oct 2026: ANI, citing the Indian Navy, reported that a Rafale M landed on INS Vikrant on its maiden attempt, beginning trials; as of 27 Nov 2026 we found no PIB release on it, and no delivery to India.
The Three Earlier Carriers
The first Vikrant and 1971. The Navy's first carrier was commissioned on 4 Mar 1961, sailed from Belfast the next day and reached Bombay on 3 Nov 1961 (PIB). In December 1971 her Sea Hawks and Alizés struck Chittagong, Cox's Bazar, Khulna and Mongla, and with other ships she helped enforce a blockade of East Pakistan, according to PIB. The fleet side of that story is on Eastern Fleet, and the war on the Liberation War of 1971.
INS Viraat. As HMS Hermes the ship served in the Falklands campaign of 1982. India bought her on 24 Apr 1986. PIB records her role in Operation Jupiter (1989) and Operation Parakram (2001 to 2002). The Sea Harrier fleet was decommissioned on 11 May 2016, and Viraat followed on 6 Mar 2017 at Mumbai.
INS Vikramaditya. PIB describes over 285 m, 23 decks, over 1,600 personnel and a range of over 7,000 nautical miles. On 30 Nov 2024 the Ministry of Defence signed a Rs 1,207.5 crore contract with Cochin Shipyard for a short refit and dry docking; PIB says she will rejoin the active fleet with upgraded combat capability. In June 2023 she and the new Vikrant took part together in a multi-carrier operation (PIB).
The Carrier Battle Group
A carrier never sails alone. A carrier battle group is the carrier plus the ships that guard it. Destroyers and frigates screen it against air, surface and underwater threats, a submarine works ahead, helicopters hunt submarines, and a fleet tanker keeps everyone fuelled. PIB lists the carrier's own functions as surveillance, air defence, airborne early warning, protection of sea lines of communication and anti-submarine warfare.
The escorts are the guided-missile destroyers and frigates; each carrier works with one of the two fleets, Western or Eastern, as set out on Fleet Operations; the submarines that cover the group are on Submarines.
The Next Carrier: What Is Officially Stated
This is the one part of the page that changes, so it is dated: as of 27 November 2026.
- PIB's backgrounder of 24 Oct 2025 refers to "the Indian Navy's vision for a second indigenous aircraft carrier". It gives no design, builder, cost or date.
- We found no official announcement of a Defence Acquisition Council approval, a contract or a ship name. Names and tonnages online come from press reports.
- The same backgrounder mentions plans to station INS Vikrant at Visakhapatnam, to strengthen the Eastern Naval Command, with no date.
There is a stated vision, not an approved project. Do not give a ship name, tonnage or year for it. The India-built carrier is IAC-1, hence "IAC-2" in discussion.
Exam pins
- INS Vikrant (R11): first carrier, ex-HMS Hercules, commissioned 4 March 1961, decommissioned 31 January 1997; played a role in the 1971 war.
- INS Viraat: ex-HMS Hermes, commissioned 12 May 1987, decommissioned 6 March 2017; Sea Harrier fleet retired 11 May 2016.
- INS Vikramaditya: ex-Admiral Gorshkov (Russia), commissioned 16 November 2013 at Severodvinsk; biggest ship in the Navy.
- INS Vikrant (IAC-1): designed by the Warship Design Bureau, built at Cochin Shipyard, commissioned 2 September 2022, 76% indigenous, about 45,000 tonnes.
- Today's carriers use STOBAR: ski-jump to launch, arrester wires to land. The Sea Harrier (retired 2016) was a STOVL aircraft.
- The carrier fighter is the MiG-29K; the early-warning helicopter is the Kamov-31.
- Rafale M: agreement of 28 April 2025, 26 aircraft (22 + 4), delivery to be completed by 2030.
- A second indigenous carrier is a stated vision only (PIB, Oct 2025): no approval has been announced.
Asked in past papers
Carrier questions ask for the ship behind a name, or which carrier has left service.
What is India's first Indigenous Aircraft Carrier (IAC) called?
(a) Vikrant (b) Virat (c) Vaibhav (d) Varahe
Answer: (a). INS Vikrant, built at Cochin Shipyard and commissioned on 2 September 2022. Virat (b) is the tempting option: INS Viraat was a second-hand British ship and left service in 2017.
Which one of the following is a decommissioned aircraft carrier?
(a) INS Rajput (b) INS Chakra (c) INS Khanderi (d) INS Viraat
Answer: (d). INS Viraat was decommissioned on 6 March 2017 (PIB). The other three are not carriers: Rajput was a destroyer, and Chakra and Khanderi are submarines, so Viraat is the only carrier among the options.
INS Vikramaditya is the name of
(a) an aircraft carrier (b) a nuclear submarine (c) a memorial for the sailors (d) a naval hospital
Answer: (a). The ex-Admiral Gorshkov, commissioned on 16 November 2013. The stored key for this question was blank; the answer here is checked against PIB. Option (b) is the trap: the Navy's submarines carry names like Arihant and Chakra.
Examiners ask name to type (is this ship a carrier, destroyer or submarine?) and which carrier is indigenous or decommissioned. Learn each carrier with its builder country. Our daily defence notes and the NDA and CDS past-paper pages give more practice.
Practice MCQs (with answers)
- The first INS Vikrant (R11) was commissioned into the Indian Navy on
- 2 September 2022
- 4 March 1961
- 12 May 1987
- 16 November 2013
- INS Viraat was originally built for the Royal Navy as
- HMS Hercules
- Admiral Gorshkov
- HMS Hermes
- HMS Invincible
- INS Vikramaditya was commissioned into the Indian Navy at
- Kochi
- Mumbai
- Karwar
- Severodvinsk
- In a STOBAR carrier, aircraft take off and land by means of a
- ski-jump and arrester wires
- steam catapult and arrester wires
- vertical thrust and hovering
- ski-jump and hovering
- Which Indian carrier was built at Cochin Shipyard?
- INS Viraat
- INS Vikramaditya
- The 2022 INS Vikrant
- The 1961 INS Vikrant
- The agreement of 28 April 2025 for the Rafale M covers how many aircraft?
- 22
- 26
- 36
- 62
1-b, 2-c, 3-d, 4-a, 5-c, 6-b. Q2: Hercules became the first Vikrant and Admiral Gorshkov became Vikramaditya, so Hermes is Viraat's name. Q3: she was commissioned in Russia. Q4: a steam catapult is CATOBAR and hovering is STOVL. Q5: the 1961 ship was British-built, Viraat British and Vikramaditya Russian. Q6: 22 is the single-seat count and 36 is the Air Force's Rafale order of 2016.
Where to Go Next
Go back to Indian Navy Surface Ships for the destroyers, frigates and corvettes, or read Naval Aviation for the squadrons that fly from the deck. For the career side, read career in the Indian Navy. Boards ask "know your service"; our SSB interview tips show how to turn these facts into answers. Graduates enter the Navy through the CDS course to the Indian Naval Academy, and 12th-pass candidates through the Naval wing of the NDA, covered by our NDA batches.
Frequently asked questions
How many aircraft carriers does India have?
Two are in service: INS Vikrant, commissioned on 2 September 2022, and INS Vikramaditya, commissioned on 16 November 2013. PIB's April 2025 backgrounder states that the Navy operates these two. The earlier carriers, the first INS Vikrant and INS Viraat, were decommissioned in 1997 and 2017.
Which is India's first indigenous aircraft carrier?
INS Vikrant (IAC-1), designed by the Navy's Warship Design Bureau and built by Cochin Shipyard Limited in Kochi. It was commissioned by the Prime Minister on 2 September 2022, with about 76% indigenous content, according to PIB. It is the largest warship ever built in India, at 262.5 metres and about 45,000 tonnes.
What is the difference between STOBAR, CATOBAR and STOVL?
All three describe how aircraft leave and land on a carrier. STOBAR uses a ski-jump to launch and arrester wires to land, CATOBAR uses a catapult to launch and arrester wires to land, and STOVL jets such as the Sea Harrier take off after a short run and land vertically. India's two carriers in service are STOBAR.
Is India building a third aircraft carrier?
PIB's backgrounder of 24 October 2025 mentions the Navy's vision for a second indigenous aircraft carrier but gives no design, builder, cost or date. As of 27 November 2026 we found no official announcement of an approval or a contract. Anything more detailed comes from press reports, not from the government.
Which fighter jets fly from Indian aircraft carriers?
The MiG-29K flies from both INS Vikrant and INS Vikramaditya. India signed an agreement on 28 April 2025 for 26 Rafale M fighters, 22 single-seat and four twin-seat, and PIB says delivery would be completed by 2030. The Sea Harrier, which flew from the older carriers, retired on 11 May 2016.
More in Navy Surface Ships
← Back to Navy Surface Ships · Defence GK home
Sources: pib.gov.in/PressReleasePage.aspx?PRID=2182277 · pib.gov.in/PressReleasePage.aspx?PRID=1856230 · pib.gov.in/FeaturesDeatils.aspx?NoteId=151135 · pib.gov.in/PressReleasePage.aspx?PRID=1483700
Preparing for CDS or OTA?
Cavalier's CDS/OTA batches teach the whole GK paper, defence awareness included, with PYQ drills, weekly tests and SSB training.